KB2

About KB2

KB2 sits between Knebworth and the A1(M) to the south of Park Lane. At the southern end of the site, Gipsy Lane crosses through diagonally about two-thirds of the way down.

KB2 has a rolling topography that results in diagonal valleys running across the site.

It has relatively few trees, but there are small patches of hedgerow along Gipsy Lane and crossing the site from east to west alongside the road.

Artist impression of emerging proposals
Artist impression of emerging proposals

Objectives

Key strategic objectives for KB2

  • Using the topography and surface water routes as the structuring features of the layout
  • Create a well-connected development between homes and the land for the new Primary School

KB2

Key aspects of the development on KB2

Housing

The current proposals are considering the delivery of around 250 homes at KB2, with a mix including market and affordable homes.

Open space

The valley features through KB2 offer the chance to combine surface water drainage requirements with linked open spaces creating rich biodiversity.

KB2 proposed application boundary
KB2 proposed application boundary
Emerging illustrative KB2 masterplan
Emerging illustrative KB2 masterplan

KB2

Land for a new Primary School

The proposals for KB2 will include provision of land for a new Primary School.

Close